All BPC
Packages during they run time they are executed by SAP Job in SAP BW backend
system. Sometime it is useful to have a look at these jobs in case some issue
occurred and one needs to analyze it.
In case of
BPC Package investigation starts in EPM add-in in menu Data Manager -> View
Status -> View Package Status. Here in column called SEQ is a generated
string that uniquely identifies run time of the BPC Package.
With
that, SEQ ID we go to SAP BW backend into table called UJD_STATUS (BPC: Package
Status). The value of SEQ ID column we put to LOG_ID (Log-ID of a Process Chain Run) field and
as a result, in JOB_NAME field we get the real SAP job name that can be further
investigated in e.g. t-code SM37.
No comments:
Post a Comment